Guide · June 5, 2026
Roofing Estimate Template (Free + AI Generator)
A clear roofing estimate wins more jobs and prevents disputes. Use the template below or let BidScopePro's AI generate a full, branded roof estimate in seconds.
What every roofing estimate must include
- Roof measurements — squares, pitch, waste factor (10-15%).
- Tear-off scope — layers, decking inspection, dump fees.
- Underlayment — synthetic vs. felt, ice & water shield.
- Shingles — brand, line, color, warranty class.
- Flashing & accessories — drip edge, step flashing, pipe boots, ridge vent.
- Labor — crew size, days, per-square rate.
- Exclusions & warranty — decking surcharge, gutter work, workmanship years.
Quick pricing math
- Materials: $30-$45/bundle × 3 bundles/square + underlayment + flashing. Add 10-15% waste.
- Labor: $150-$350 per square; more for steep pitch or multi-story.
- Disposal: $400-$800 per dumpster plus tonnage.
- Overhead + profit: 15-25% markup on materials, margin on labor.
Recommended shingle & material brands
Try BidScopePro free for 7 days.
AI estimates, branded proposals, and Stripe payments. No credit card.